.png)

Pico de Oro
The Pico de Oro subterranean mine features three levels, with a vertical depth of approximately 120 meters. Comprehensive 3D models, detailed technical descriptions, and an established sampling database support the mine's exploration and operational planning.
​​
With active potential, the mine is ready to commence production on a visible vein identified during a recent site visit. The vein, which displayed visible gold, underscores the mine’s strong prospects for high-grade gold production and its strategic value within the project portfolio.
Rock Sampling
PICO DE ORO
During our recent visit to La Maria Mine on December 16, 2024, we conducted a detailed inspection of the Pico de Oro subterranean mine, accompanied by two professional geologists. The walkthrough revealed multiple entry points with potential for perforation. As we progressed further into the mine, we identified and examined a visible vein, from which rock ore samples were collected for analysis.
​
The samples immediately displayed visible gold throughout the cracked rock, further confirming the mine's exceptional potential for immediate gold production. These findings emphasize the strategic importance of the Pico de Oro mine and its readiness for operational advancement.



